Close Menu
  • Home
  • Crypto News
    • Bitcoin
    • NFT News
  • Metaverse
  • Defi
  • Blockchain
  • Regulations
  • Trading

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Dogecoin Follows Bearish June Trend With over 4% Losses – Is The Worst Over?

June 9, 2025

Ripple Launches Structured Program to Back Japanese XRPL-Focused Web3 Startups

June 9, 2025

Coinbase Cuts Account Lockouts by 82% – Can It Finally Win Back Trader Trust?

June 9, 2025
Facebook X (Twitter) Instagram
CredBit.com
  • Home
  • Crypto News
    • Bitcoin
    • NFT News
  • Metaverse
  • Defi
  • Blockchain
  • Regulations
  • Trading
Facebook X (Twitter) Instagram
CredBit.com
Home » Secures 200 MW for Bitcoin Mining
Regulations

Secures 200 MW for Bitcoin Mining

May 28, 20243 Mins Read
Facebook Twitter WhatsApp Pinterest Telegram LinkedIn Tumblr Email Reddit VKontakte
Secures 200 MW for Bitcoin Mining
Share
Facebook Twitter LinkedIn Pinterest Telegram Email
  • Expansion allows Bitfarms to manage 528 MW, leveraging existing infrastructure to reduce costs per megawatt.
  • Amidst expansion, former CEO Geoffrey Morphy sues Bitfarms for $27 million over alleged contractual breaches.

Despite regulatory uncertainties in Paraguay, Bitfarms, a Bitcoin mining company listed on both Nasdaq and the Toronto Stock Exchange, has successfully secured an additional 100 megawatts (MW) of electricity from Paraguay’s state-owned power company, Administración Nacional de Electricidad (ANDE). This development comes as lawmakers in Paraguay deliberate on potentially banning mining activities related to the cryptocurrency.

Bitfarms announced on its official website that this new allocation of power would double the hydroelectric capacity of its facility under construction in Yguazú, eastern Paraguay. This site is expected to be fully operational by 2025. Initially, the Yguazú site was allocated 100 megawatts of power, and with the recent expansion, it will now manage a total of 200 megawatts.

The construction of the Yguazú farm, which began in March, has progressed swiftly, with high-tension interconnections already established to ANDE’s substation. According to Bitfarms, the hydroelectric power will be generated at a cost of $0.039 per kilowatt-hour (kWh), a rate not subject to inflationary increases. 

Ben Gagnon, Bitfarms’ Director of Mining, stated that the additional 100 MW provides a cost-effective growth path through the first half of 2025 and does not affect their target of achieving a hash rate capacity of 21 exahashes per second by 2024.

“Importantly, this expansion leverages our existing construction plan, amortizing development costs over a broader infrastructure base and reducing overall costs per megawatt,” added Gagnon.

With this expansion, Bitfarms aims to increase the megawatts under its management by 23%, rising from 428 MW to 528 MW. Gagnon emphasized that this expansion leverages their existing construction plan, spreading development costs over a broader infrastructure base and reducing overall costs per megawatt.

“The additional 100 MW provides a low-cost growth path for the first half of 2025 without affecting our target of 21 EH/s by 2024, which remains on schedule,” commented Ben Gagnon, the company’s head of Mining.

Damián Polla, General Manager for LATAM at Bitfarms, highlighted the rapid progress of the company’s projects in Paraguay, facilitated by the expansion of infrastructure at the Paso Pe and Yguazú parks. 

Local News reported in July 2023 that construction had begun on two new mining farms in Paraguay, one in Villarrica and the other in Yguazú, marking the country’s growing importance in the industry due to its geographical conditions.

Bitfarms, which also operates a mega-farm in Río Cuarto, Córdoba, Argentina since 2022, views the developments in Paraguay as indicative of greater growth opportunities in Latin America compared to other regions. Polla pointed out Paraguay’s unique potential, highlighted by its abundant hydroelectric resources.

Bitfarms operates additional Bitcoin mining facilities in the United States and Canada. In April, the company announced plans to invest approximately USD 240 million to upgrade its mining equipment following the halving, aiming to increase its hash rate capacity to 21 exahashes per second.

Amid these expansions, Bitfarms is also navigating through a controversy involving its former CEO, Geoffrey Morphy, who recently filed a $27 million lawsuit against the mining firm. Morphy was expected to continue as CEO and president until a replacement could be found, following his announced departure in March. 

Allanan propiedad del exdiputado Miguel Cuevas e incautan máquinas de criptominería

However, on May 13, the company terminated him after he accused Bitfarms of breach of contract, wrongful dismissal, and aggravated and punitive damages.

Credit: Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Reddit VKontakte Telegram WhatsApp

Related Posts

SEC became a defendant in the NFT classification lawsuit

July 30, 2024

The SEC Modifies its Complaint Against Binance! Is Solana in Danger?

July 30, 2024

Inside Caitlin Long’s never-say-die bid to beat the Fed on crypto banking – DL News

July 30, 2024

Future of cryptocurrency: US surge and India’s struggle

July 30, 2024

Crypto ‘is going to go mainstream’

July 29, 2024

US-listed crypto stocks jump after Trump’s pro-bitcoin speech — TradingView News

July 29, 2024

Comments are closed.

Editors Picks

Dogecoin Follows Bearish June Trend With over 4% Losses – Is The Worst Over?

June 9, 2025

Ripple Launches Structured Program to Back Japanese XRPL-Focused Web3 Startups

June 9, 2025

Coinbase Cuts Account Lockouts by 82% – Can It Finally Win Back Trader Trust?

June 9, 2025

Japanese Senate Approves Crypto Brokerages Reform Bill

June 8, 2025
© 2025 - credbit.com - All Rights Reserved!
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Use
  • DMCA

Type above and press Enter to search. Press Esc to cancel.